What should be avoided when installing the valve?

Column:Technical article Time:2020-10-30
Valve is the most common equipment in chemical enterprises. It seems easy to install the valve, but if it is not executed according to the relevant technology, safety accidents will occur

Valves are the most common equipment in chemical enterprises. It seems easy to install valves, but if they are not executed in accordance with relevant technologies, safety accidents will occur...

No-no 1

Hydrostatic test was carried out under negative temperature in winter.
Consequence: the tube freezes quickly during the hydrostatic test, causing the tube to freeze.
Measures: water pressure test should be carried out as far as possible before winter application, and the water should be blown clean after pressure test, especially the water in the valve must be cleared in the clean, otherwise the valve will be light rust, heavy freeze crack.
During the hydrostatic test in winter, the project must be carried out at a positive indoor temperature and the water must be blown clean after the pressure test.

No-no 2

The pipeline system is not flushed carefully before completion, and the flow rate and speed cannot meet the requirements of pipeline flushing.
Water pressure strength test was even used instead of flushing.
Consequences: The water quality does not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline cross section.
Measure: Flush with the maximum flow rate or flow rate not less than 3m/s.The water color and transparency of the discharge outlet should be consistent with the visual measurement of the water color and transparency of the inlet.


No-no 3

Sewage, rainwater and condensate pipes shall be concealed without water closing test.
Consequences: may cause water leakage, and cause user losses.
Measures: The closed water test should be checked and accepted strictly according to the standard.Underground installation, ceiling, pipe and other hidden sewage, rainwater, condensate pipe to ensure that no leakage.

No-no 4

In the water pressure strength test and tightness test of pipeline system, only observe the change of pressure value and water level, and the inspection of leakage is not enough.
Consequences: Leakage occurs after the operation of the pipeline system, which affects the normal use.
Measures: When the piping system is tested in accordance with the design requirements and construction specifications, the pressure value or water level changes shall be recorded within the specified time, and in particular, the leakage shall be carefully checked.

No-no 5

Butterfly valve flanges use ordinary valve flanges.
Consequence: butterfly valve flange and the general valve flange size is not the same, some flange diameter is small, and butterfly valve disc is large, resulting in not open or hard to open the valve damage.
Measures: according to the actual size of the butterfly valve flange flange processing flange.

No-no 6

In the construction of the building structure, there are no reserved holes and embedded parts, or the reserved holes are too small in size and the embedded parts are not marked.
Consequence: in the construction of warm sanitation project, picking out the building structure, or even cutting off the reinforced bar, affecting the safety performance of the building.
Measures: Be familiar with the construction drawings of heating and sanitation project, and actively and seriously cooperate with the construction of reserved holes and embedded parts according to the installation requirements of pipes, supports and hangers, and refer to the design requirements and construction specifications for details.

No-no 7

During pipeline welding, the wrong opening of the pipe after the opposite port is not in a center line, no clearance is left for the opposite port, no groove is removed for the thick-wall pipe, and the width and height of the welding seam do not meet the requirements of the construction code.
Consequence: the wrong orifice of the pipe is not in a center line, which directly affects the welding quality and perception quality.No clearance is left for the counterpart, no slotting is done for the thick-walled pipe, and the welding strength cannot be reached if the width and height of the welding seam do not meet the requirements.
Measures: After welding the pipe to the other side, the pipe should be on the center line instead of the other side.A gap should be left at the opposite mouth;Thick - walled pipes should be slotted.In addition, the width and height of the weld shall be welded in accordance with the requirements of the code.

No-no 8

Pipelines are directly buried in frozen soil and untreated loose soil, and the piers are not properly spaced and located, or even in the form of dry code bricks.
Consequence: The pipe was damaged in the process of compaction of backfill earth due to unstable support, which caused rework and repair.
Measures: The pipe shall not be buried in frozen soil and loose soil without treatment. The distance between piers shall meet the requirements of construction code, and the supporting pad shall be firm. In particular, the pipe connection shall not bear shear force.Brick piers to use cement mortar masonry, ensure integrity, firm.

No-no 9

The material of the expansion bolts for fixing the pipe bracket is inferior, the aperture of the installation expansion bolts is too large or the expansion bolts are installed on the brick wall or even the light wall.
Consequences: Loose pipe support, pipe deformation, and even fall off.
Measures: qualified products must be selected for expansion bolts. If necessary, samples should be taken for test inspection. The diameter of expansion bolts installed should not be 2mm larger than the outside diameter of expansion bolts.

No-no 10

Flanges and gaskets for pipe connections are not strong enough, and the connecting bolts are short or thin in diameter.Rubber pads are used for heat pipes, double or bevel pads for cold water pipes, and flange gaskets protruding into the pipes.
Consequence: flange connection is not tight, even damaged, leakage phenomenon.The penetration of the flange gasket into the tube will increase the flow resistance.
Measures: flanges and gaskets used in pipelines must meet the requirements of working pressure in pipeline design.
Rubber asbestos gaskets should be used for flange gaskets of heating and hot water supply pipes;Rubber gasket should be used for flange gasket of water supply and drainage pipeline.
The gasket of the flange shall not protrude into the tube, and the outer circle to the flange bolt hole shall be appropriate.Bevel pads or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the diameter of the flange flange. The length of the bolt protruding nut should be 1/2 of the thickness of the nut.

No-no 11

Incorrect valve installation method.
For example, the water (steam) flow of globe valves or check valves is opposite to the sign, the stem is installed downward, horizontal check valves are installed vertically, the handle of rising stem gate valve or butterfly valve has no open and closed space, the stem of hidden valve is not oriented toward the inspection door.Consequences: valve failure, switch maintenance difficulties, valve stem down often cause water leakage.
Measures: Install in strict accordance with the valve installation instructions, keep the stem of the rising gate valve open height, fully consider the rotation space of the butterfly valve handle, all kinds of valve stem should not be lower than the horizontal position, let alone down.The hidden valve should not only set the inspection door to meet the needs of opening and closing the valve, but also the stem should face the inspection door.

No-no 12

The installation valve specifications and models do not meet the design requirements.
For example, the nominal valve pressure is less than the system test pressure;When the diameter of water supply branch pipe is less than or equal to 50mm, use gate valve;Cut-off valves are used in the dry and riser pipes for hot water heating.Butterfly valve is used for water suction pipe of fire pump.
Consequences: Affect the valve normal open and close and adjust resistance, pressure and other functions.Even caused damage to the valve during the operation of the system and forced repair.
Measures: Familiar with the application range of all kinds of valves, according to the design requirements to choose the valve specifications and models.Nominal valve pressure to meet the requirements of system test pressure.According to the requirements of the construction code: cut-off valve shall be used for the water supply branch pipe diameter less than or equal to 50mm;Gate valves should be used when pipe diameter is greater than 50mm.Hot water heating dry, vertical control valve should be used gate valve, fire water pump suction pipe should not be used butterfly valve.

No-no 13

The valve does not perform necessary quality inspection before installation.
Consequences: In the operation of the system, the valve switch is not flexible, the shutdown is not strict and the phenomenon of leakage (steam) occurs, causing rework and repair, and even affecting the normal water supply (steam).
Measure: Before installation, the valve should be tested for compressive strength and tightness.The quantity of each batch (same brand, same specification, same model) shall be randomly checked by 10% and not less than one.The strength and tightness test should be done one by one for the closed - circuit valve installed on the main pipe.The strength and tightness test pressure of the valve should comply with the "Construction Quality Acceptance Code for Building Water Supply, Drainage and Heating Engineering" (GB 50242-2002).

No-no 14

The main materials, equipment and products used in the construction are in lack of technical and quality appraisal documents or product certificates conforming to the current national or ministry standards.
Consequences: the project quality is not qualified, there are potential accidents, can not be delivered to use on schedule, must be reworked and repaired;Delay of construction, increase of manpower and material input.
Measures: The main materials, equipment and products used in water supply and drainage and heating and sanitation engineering shall meet the technical and quality identification documents or product qualification certificates issued by the state or the Ministry;The product name, model, specification, national quality standard code, date of manufacture, name and place of manufacturer, inspection certificate or code of the ex-factory product shall be indicated.

No-no 15

The valve inversion
Consequences: Check valve, throttle valve, pressure reducing valve, check valve and other valves have directionality, if installed in reverse, throttle valve will affect the service effect and life;Pressure relief valves do not work and check valves can be dangerous.
Measures: General valves, direction marks on the body;In case of no, the valve should be correctly identified according to the working principle.The valve chamber of the globe valve is asymmetrical, the fluid should be let from the bottom to the top through the valve mouth, so that the fluid resistance is small (determined by the shape), open to save effort (due to the medium pressure up), closed after the medium does not pressure packing, easy to repair.This is why the globe valve cannot be reversed.
Gate valves should not be inverted (i.e., handwheel down), as this can cause media to remain in the cover space for a long time, corrode the stem, and is No- No to certain process requirements.It is inconvenient to change packing at the same time.
Open stem gate valves should not be installed underground or the exposed stem may corrode due to moisture.
Lifting type check valve, when the installation to ensure that its disc vertical, in order to lift flexible.
Swing check valve, install to ensure its pin shaft level, so that the swing flexible.
Pressure relief valves should be installed upright in a horizontal pipe line, do not tilt in all directions.

No-no 16

Manual valve opening and closing, too much force
Consequences: light valve damage, serious safety accidents
Measure: The manual valve, its handwheel or handle, is designed according to ordinary manpower, taking into account the strength of the sealing surface and the necessary closing force.So you can't use a long lever or a long plank to move the plank.Some people are used to using the board hand, should be strict attention, do not exert too much force, otherwise easy to damage the sealing surface, or plate broken handwheel, handle.Open and close the valve, the force should be smooth, not impact.Some impact open and close high pressure valve components have been considered the impact and the general valve can not wait.For the steam valve, before opening, should be pre-heated, and exclude condensate, open, should be as slow as possible, so as not to occur water hammer phenomenon.When the valve is fully open, the handwheel should be reversed a little, so as to tighten between threads, so as not to loosen and damage.For open stem valves, remember stem positions when fully open and fully closed to avoid hitting the upper dead center when fully open.It is convenient to check whether it is normal when closed.If the valve does fall off, or between the valve core seal embedded larger debris, when the valve stem position is about to change.When the pipeline is first used, there are a lot of internal dirt, the valve can be slightly opened, using the high-speed flow of the medium, wash it away, and then gently closed (can not close quickly, violently closed, in case of residual impurities caught in the sealing cover), open again, so repeated many times, clean the dirt, then put into the normal work.Often open the valve, sealing surface may be sticky with dirt, when closed, also want to use the above method to flush clean, and then formally close.If the handwheel or handle is damaged or lost, it should be fitted immediately, and can not be replaced by the movable plate hand, so as to avoid damage to the valve stem square, not open and close properly, so as to cause accidents in production.Some media, cooled after the valve closed, so that the valve parts shrink, the operator should be closed at the appropriate time again, so that the sealing surface without fine seam, otherwise, the medium from the fine seam high-speed flow, it is easy to erosion sealing surface.During the operation, if the operation is found to be too strenuous, the reason should be analyzed.If packing is too tight, loosen appropriately. If stem is askew, advise repair.Some valves, in the closed state, the closure of the thermal expansion, causing difficulty in opening;If it must be opened at this time, unscrew the bonnet half to one turn to eliminate stem stress and then turn the plate.

No-no 17

Improper installation of valve in high temperature environment
Consequences: Causing a spill
Measures: The high-temperature valve above 200℃ is at room temperature when installed, but after normal use, the temperature rises, the bolt expands in heat, the gap increases, so it must be tightened again, called "hot tight", the operator should pay attention to this work, otherwise it is easy to leak.

No-no 18

Cold weather does not drain in time
Measures: when the weather is cold, the water valve should be closed for a long time, the water should be removed after the valve.After the steam valve stops steam, condensate should also be removed.The bottom of the valve is like a silk plug, it can be opened to drain.

No-no 19

Nonmetal valve with too much opening and closing force
Measure: nonmetal valve, some hard and brittle, some low strength, operation, open and close force can not be too big, especially can not make strong.Also be careful not to bump objects.

No-no 20

The new valve packing is too tight
Measures: when the new valve is used, the packing should not be pressed too tight, with no leakage as a degree, so as not to pressure the valve stem is too big, speed up the wear and tear, and open and close laboriously.The quality of valve installation directly affects use, so careful attention must be paid to valve direction and position, valve construction, valve protection, bypasses and instrumentation, and valve packing replacement.

No-no 21

The installation position has no operating space
Measures: the valve installation position must be convenient for operation;Even if the installation is temporarily difficult, the operator's long-term work should be considered.Best valve handwheel and chest even (generally 1.2 meters away from the operation floor), so, open and close the valve more energy saving.Landing valve hand wheel should be up, do not tilt, so as not to operate awkwardly.The wall machine depends on the valve of the equipment, also want to leave room for the operator to stand.To avoid relying on the sky operation, especially acid and alkali, toxic medium, otherwise very unsafe.

No-no 22

Hit a valve made of brittle material
Measures: installation and construction must be careful, do not hit the valve made of brittle materials.Before installation, check the valve to see if there is any damage, especially to the stem.Also turn a few times to see if the valve is skewed, because during transportation, the most prone to skew valve stem.Also remove debris from the valve.When the valve is hoisted, the rope should not be tied to the handwheel or stem to avoid damaging these parts. It should be tied to the flange.Be sure to clean the line to which the valve is attached.Iron oxide chips, sand, welding slag and other sundries can be blown by compressed air.These sundries, not only easy to scratch the sealing surface of the valve, including large particles sundries (such as welding slag), but also can block the small valve, make its failure.When installing the screw valve, the sealing filler (wire and lead oil or polytetrafluoroethylene raw material belt) should be wrapped on the pipe thread, do not get into the valve, in order to avoid the memory of the valve, affect the medium flow.When installing flanged valves, pay attention to tighten bolts symmetrically and evenly.Valve flange and pipe flange must be parallel, reasonable clearance, to avoid valve too much pressure, or even cracking.Particular attention should be paid to brittle materials and low strength valves.The valve to be welded with the pipe should be spot-welded first, then fully open the closed parts, and then welded dead.

No-no 23

The valve is not insulated and cooled
Action: Some valves also require external protection, which is insulation and cooling.Steam lines are sometimes added to heat insulation.
What kind of valves should be insulated or cooled depends on production requirements.In principle, where the valve medium to reduce the temperature is too much, will affect the production efficiency or freeze damaged valve, the need for insulation, or even heat;Where the valve bare, adverse to production or cause frost and other adverse phenomena, the need to keep cold.Insulation materials include asbestos, slag wool, glass wool, perlite, diatomite, vermiculite, etc.Keep cold material to have cork, perlite, foam, plastic.

No-no 24

Bypass not installed on trap
Measures: Some valves, in addition to the necessary protection facilities, also have bypasses and instrumentation.Bypass is installed to facilitate maintenance of the trap.Other valves may also be bypassed.Bypass installation depends on valve condition, importance, and production requirements.

No-no 25

Packing not replaced regularly
Measures: inventory valve, some packing is not good, and some with the use of media, it is necessary to replace the packing.
The valve faces thousands of different media, packing box is always filled with ordinary packing, but when used, must let the packing and the medium to adapt.
When changing packing, press in round by round.The seams of each ring shall be 45 degrees, and the joints of the rings and rings shall be staggered 180 degrees.The height of the packing shall allow for further compaction of the gland and, at the present time, the proper depth of the packing chamber at the lower gland, normally 10-20% of the total depth of the packing chamber.
For high demand valves, seam Angle is 30 degrees.The seam between the loops is staggered by 120 degrees.
In addition to the packing, can also according to the specific situation, USES the rubber o-ring (natural rubber resistant to 60 degrees Celsius under weak base, butyl eyes below 80 degrees Celsius oil resistant rubber, fluorine rubber resistance to a variety of corrosive medium under 150 degrees Celsius) three fold type teflon ring (below 200 degrees Celsius) strong corrosive medium resistance of nylon bowl ring (below 120 degrees Celsius, ammonia alkali resistant) forming filler.A layer of polytetrafluoroethylene raw material belt outside the common asbestos packing can improve the sealing effect and reduce the electrochemical corrosion of the valve stem.
When pressing the packing, turn the stem simultaneously to keep all sides even and prevent too much dead, tighten the gland evenly without tilting.


主站蜘蛛池模板: 久草在线视频在线_午夜视频网址_精品一区二区6_亚洲精品久久久一区二区三区_欧美黑吊粗大猛烈18P_91免费小视频在线观看_激情五月综合网_日批免费在线观看 | 99色成人_久久亚洲精品无码aⅴ大香_全部免费毛片在线播放网站_国产下药迷倒白嫩丰满美女BD_亚洲成人久久精品_边摸边脱边吃奶边做视频_日韩欧美精选_一区二区三区国产 | 中文字幕在线视频日本_91av视频在线观看免费_大地资源在线观看免费高清动漫_亚洲a级大片_麻豆久久精品_国内精品亚洲_扒插扒插_zzijzzij亚洲日本少妇熟睡 | 96sao精品视频在线观看_一二三级黄色片_男男无码sm调教gv资源_欧美黑人黄色片_粉嫩精品国产色综合久久不8_性无码免费一区二区三区在线_国产一区二区三区不卡av_色欲色欲天天天WWW亚洲伊 | www.久久r_爆乳在线无码AV_精品国产91久久_天天爽夜夜爽夜夜爽视频_亚洲aaa视频_男人扒开女人桶到爽中国的人_亚洲自偷自拍另类11P_国产精品精华液网站 | 成人网子_天天人人_精品一区国产_九色丨PORNY丨自拍ICU_91视频福利_青青青草网站免费视频在线观看_无码人妻久久一区二区三区蜜桃_中文天堂国产最新 | 国产V片在线播放免费无码_开心婷婷五月激情综合社区_97caoporn人人_99色在线视频_开心激情站_一本大道在线无码一区_狠狠操91_欧美日日 | www..com国产_国产高清狼人香蕉在线_色哟哟视频在线观看免费播放_多啪啪免费视频_亚洲激精日韩激精欧美精品_www.成人影院_黑人与娇小精品av专区_国产真实乱人偷精品人妻 | 97综合色_欧美亚洲另类在线观看_在线偷拍自拍_亚洲精品aaaa精品_蜜臀AV色欲A片无码精品一区_亚洲av无码精品网站_日日大香人伊一本线久_欧美一级视频免费在线观看 | 亚洲国产高清AV网站_粉色视频成人免费看片视频_日本高清无卡码一区二区久久_91精品瑜伽老师夯老师网址_精品欧美一区二区在线观看_91精品国产毛片_日本黄色一级片免费_男男GAY啪啪网站18禁 | 中文字幕永久视频_奇米狠狠操_国产精品美女自拍视频_狼群社区在线看片_黄网在线免费观看_成人av专区_日韩在线一_涩涩激情 | 日本日本乱码伦视频免费_日日夜夜综合网_se69色成人网wwwsex_成人污污污WWW网站免费_爱情公寓第2季在线观看_国产第一页在线_色播色播色播色播色播在线_在线日韩欧美 | 日韩网站在线播放_色青青草原桃花久久综合_欧美另类性_东京热无码人妻系列综合网站_桃色一区二区三区_av琪琪色_国产亲子乱弄免费视频_国产精品热久久高潮AV袁孑怡 | 日本久久片_999www成人免费视频_亚洲中文字幕无码久久2020_最新精品视频2019在线视频_av自拍亚洲_久久国语视频对白_福利姬在线观看_女同亚洲精品一区二区三 | 国产激情综合_日本黄色片aaaa_国产九九99久久99大香伊_日本专区_色吊丝2_中日韩av在线播放_亚洲女同一区二区_日本一区二区在线高清观看 | 精品a级片_91麻豆精品在线_动漫精品无码h在线观看_欧美日韩国产精品免费观看_日本免费A级毛一片_极品白嫩的小少妇_午夜日本福利_亚洲欧美成人一区 | 中文字幕人妻中文av不卡专区_亚洲AV综合AV成人小说_中文字幕另类日韩欧美亚洲嫩草_在线观看视频毛片_国产精品美女视频免费午夜版_日本在线不卡中文字幕资源_日韩国产人妻一区二区三区_一个人看的www视频免费观看 | 亚洲无毛视频_久久亚洲色WWW成人图片_色综合久久久久综合99_综合网久久_日韩视频在线观看中文字幕_午夜精品久久久久久久99樱花_在线免费av网址_精品人妻无码一区二区三区性 | 亚洲一区二区三区精品在线_国产精品综合久久第一页_777一区二区_1区2区3区视频_久草国产在线视频_久久毛片免费看_cba今日赛事回看_国内精品视频 | 男人的天堂免费网站_v11av在线播放_91视频在线观看视频_亚洲一区二区三区av激情_国产情侣真实露脸在线_免费黄篇_jijzzizz老师出水喷水多毛_性夜影院爽黄E爽 | 国产精品69久久_国产精品美女www_欧美国产精品_国产91在线播放九色快色_色姑娘综合_天天番号网_无毒av网站_最新免费黄色 | 8008幸福宝小说最新章节_97久久国产精品超碰热_后入到高潮免费观看_国产小视频精品_久久精品亚洲第一福利_日韩欧美在线视频_中国女人内谢69XXXXXA片_成全高清视频免费观看动漫版 | 欧美国产日韩午夜_aaa在线_日日做夜狠狠爱欧美黑人_免费无码不卡视频在线观看_欧美精品激情在线_国产欧美人体大胆一区亚洲性爱一级片_日韩在线观看视频一区二区_av网在线观看 | 免费麻花豆传媒剧国产_xxx黄色片_一本一道波多野结衣AV中文_久久久久久av_欧美特一级_欧美DODK巨大黑人_福利免费观看体检区_chinese45丰满成熟hd | 成人三级在线_99re热精品视频_日韩av在线一区二区三区_亚洲国产成人高清精品_无码人妻精品一区二区三区东京热_日日夜夜天天久久_av网址免费在线观看_免费看成年人 | 国产成视频在线观看_欧美日本网站_熟妇女人妻丰满少妇中文字幕_怡春院综合_老司机午夜免费视频_亚洲国产成人精品无码区2021_久久一精品_久久蜜桃资源一区二区老牛 | 日本欧美一区二区免费不卡_中国xxxxxxxxx88_日韩一级理论片_日韩欧美网_亚洲av无码成h人动漫在线观看3d_色射综合_亚洲精品国产剧情久久9191_男同性恋在线观看 | 国产精品入口传媒小说_国产肥老妇对白清_天堂在线www_人人天天夜夜爽爽_性少妇VIDEOXXⅩ欧美69_奇米视频7777_日本无删减在线_少妇福利 | 中文字幕亚洲二区_日日摸天天做天天添天天欢_欧美另类精品xxxx孕妇_久久九九精品久久_亚洲男同gay在线观看_一区二区三区福利_久久视频免费观看_福利片在线观看 | 久久久久精品久久久久影院蜜桃_国产免费啪啪_国内外成人免费视频_毛片久久_无限资源欧美国产好片在线_99国内精品久久久久久久夜夜嗨_国产特级黄色片_aaaa级大片 | 久久99国产精品久久99果冻传媒_亚洲成人精品女人久久久_a一区二区三区_九九综合_青草青草久热精品视_日韩观看_yellow免费观看网站_久久精品高清视频 | 蜜汁AV无码国产_免费一区二区三区在线视频_午夜大胆裸体A级人体片_污黄视频在线播放_国产福利小视频_久久久久久a亚洲欧洲aⅴ96_欧美巨鞭大战丰满少妇_久久久综合亚洲色一区二区三区 | 久一视频在线_国产精品人妻无码久久久免费看_日本女人黄色大片_爽死你欧美大白屁股在线_啦啦啦在线视频免费观看www_国内午夜国产精品小视频_久久久视频在线_美日韩精品 | 久久午夜夜伦鲁鲁片无码免费_日本色www_国产精品久久欧美久久一区_国产在线一二三区_中文字幕日韩一级_性色AV免费网站_日本久久性_国内毛片 | 亚洲国产精品肉丝袜久久_老师课后辅导乳揉搓H在线观看_javlib贴吧_男插女青青影院_亚洲综合区夜久久无码精品_精品一区二区三区四区在线_成人精品免费网站_亚洲欧洲自拍偷拍 | 777婷婷_饥渴女上位高潮呻吟在线播放_国产精品污WWW在线观看_91大片淫黄大片在线天堂_aⅴ色国产欧美_人妻AV中文字幕久久_国产激情无码视频在线播放性色_国产国拍亚洲精品在线 | 日本欧美在线播放_福利视频入口_91污视频在线观看_免费黄色大片_亚洲一区二区中文_欧美少妇一级片_h肉3d动漫在线观看网站_久久久久久久99精品免费观看 | 亚洲精品久久av无码一区二区_国产高清无码不卡顿在线观看_中文字幕在线影视_天天操操_久产久91精国九品打_亚洲一区二区三区777_少妇高潮av久久久久久_yw.139尤物在线精品视频 | 日本一道高清_66av在线_国产专区在线播放_国产农村a一级视频_国产在线精品无码二区二区_在线国产欧美_中文字幕在线中文一页_一级免费在线 | 高清视频在线_欧美与黑人午夜性猛交久久久_成年日韩免费大片黄在线观看_狼群社区视频WWW国语_一级a毛片免费观看久久精品_日本xxxxx片毛片免费观_日本免费一区二区三区高清视频_22222se男人的天堂 | 国产成人在线免费_黄色免费观看网址_曰韩无码AV片免费播放不卡_色久天堂_久久只精品_久久久成人毛片无码_久久人人超碰_无码免费h成年动漫在线观看 |